Tubular Solutions Inc. offers a wide range of Third Party Monitoring. Our personnel have extensive experience monitoring the following types of inspections:
Full Length Pipe Body Inspections
- Verify personnel qualifications
- Verify calibration of equipment
- Check and verify heat numbers
- Arrange bucking of accessories
- Arrange trucking
SEA (Special End Area)
- Verify personnel qualifications
- Verify solution and light intensities
- Verify adequacy of magnetic field
Drifting
- Verify drift O.D. is correct and within API specifications at startup
- Periodically check drift O.D. throughout job
Hydrostatic Testing
- Check condition and compatibility of test plugs prior to testing
- Periodically check connections for plug damage
Internal Coating
- Inspect 18" into the ID to insure there are no imperfections and coating is holiday free
Assembly Makeup and Testing
- Verify accessories size, weight, grade, and connection type match schematic specifications
- Perform a complete Visual Thread Inspection (VTI) prior to prepping the connections
- Verify load cells are properly calibrated prior to initial make-up
- Verify torque turn graphs meet manfacturers criteria for the connection
- Drift assemblies prior to and after make-up to verify connection and tube integrity
- Verify all testing equipment is within calibration and test pressures meet specifications
- Confirm test charts are withtin tolerances
- Install clean thread protectors and tag for shipping
Threading
- Verify calibration of equipment
- Verify prints are current
All jobs will be throughly documented in a report supplied to the customer. This report will include all personnel certifications and equipment calibrations and will chronologically detail the job from start to finish.